Indiana University


ComputerScience






 Home

 Contacts

 Courses

 Academics

 Careers

 Research

 People

 Calendar

 Resources

 Facilities
   FAQ
   System Notices
   Help
   Hardware
   Software
   Network
   Policies
   CSG Staff
   Lindley Hall

 Hiring

[Return to the System Notices Directory]

April 2000 - Spring 2000 System Update Information

  • Network Upgrades - We have been busy upgrading network hardware. We have been replacing 10Mbit switches with 10/100Mbit switches, so the baseline network port for the department now supports full-duplex 100Mbit switched ethernet connections. These switches are connected via 100Mbit Ethernet and 155Mbit ATM connections to the CS backbone. We are on schedule to upgrade these uplinks to 1000BaseT Gigabit Ethernet connections during the Summer of 2000.

  • Wireless Network Upgrade - We have upgraded our wireless network offering with the addition of 11Mbit 802.11 Wavelan access points. This higher speed standard significantly improves throughput and there are drivers available for notebooks running Linux, Windows, and MacOS.

  • Sun Upgrades - We are in the process of upgrading approximately 15 Sun workstations in various locations within Lindley. At the completion of these upgrades, all of the Suns in the graduate student offices should be Ultras.

  • Backup Server Upgrade - If you have ever accidentally removed a file, you know the value of reliable system backups. We are increasing our backup capacity to meet the needs of ever expanding disk usage with the addition of a Breece Hill Q4.50 tape library. This unit holds 50 DLT tapes and has 2 DLT7000 tape drives for a total capacity of 3.5 terabytes.

  • Software - Numerous software systems have been installed and upgraded recently. This includes wvWare and antiword for converting Word documents to html or text, Octave for numerical computation, Dia for drawing diagrams, as well as funstuff like Xearth and XEphem. Please see the Software Database for more information about the available software.

  • Upcoming projects - We have quite a lot of work scheduled for the Summer of 2000. This includes the following projects:

    • Networking - We are planning to add Gigabit Ethernet switches and will be making significant changes to the network architecture to increase performance and increase the number of available IP numbers.
    • Administrative Computing - The primary NT server for the administrative group will be upgraded and additional disk capacity will be added.
    • Teaching Support - The server for the teaching support clusters, hannibal, will be upgraded.
    • Burrow Upgrade - The Suns in the Burrow will be getting a boost in memory. Each machine will be getting 256MB of additional memory.
    • LH115 - The PCs in the LH115 teaching cluster will be getting a major overhaul, with faster processors and more memory.
    • CGI server - The server supporting general access to CGI programming will be upgraded.

As always, we expect to have a busy Summer so that the systems are running smoothly for the start of the Fall semester.

[Return to the System Notices Directory]








Valid HTML 4.01!