| Milestone |
Date Due | Deliverables |
|---|---|---|
| Milestone 0 | Sept 16 | Project Proposal. Life cycle, program products, reliability. Interviewing. |
| Milestone 1 | Sept 30 | Feasibility Study. Systems analysis. Software management, Benefit/cost analysis. Team organization. |
| Requirements Reviews | Oct 28-Oct 31 | Walkthrough of Requirements Specification. Draft E-R model. Peer feedback on requirements. |
| Milestone 2 | Oct 31\¹, Nov 6\² | Requirements Specification, Project Plan, Quality Assurance Plan. Data flow diagrams, E-R model. Project scheduling and management. |
| Milestone 3 | Nov 18 | Prototype. User interfaces. Software evaluation. Tool experience. |
| Milestone 4 | Nov 25\¹, Dec 4\² | Preliminary Design and Coding Standards. File organization. Pseudo-code, HIPO, Warnier-Orr diagrams. The user interface, report design. Module, interface, and documentation standards. |
| Presentations | Dec 4-Dec 11 | Project Presentations. Project goals and general approach toward achieving these goals. Specifications, ER model, and user interface. Client oriented. |
| Design Reviews | Jan 20-Jan 30 | Design Walkthroughs. Peer feedback on designs. |
| Milestone 5 | Feb 3\¹, Feb 5\² | Detailed Design and Test Plans. Software specification and design. System flowcharts. Relational design issues. |
| Milestone 6 | Mar 3 | Implementation. Programming style, readability. Documentation. Code walkthroughs. Unit testing. |
| Milestone 7 | Mar 31 | Testing. Integration testing. Debugging. |
| Milestone 8 | Apr 14\¹, Apr 21\² | Installation and Documentation. Post mortem. |